Production Performance Analysis Using a Coupled Reservoir–Surface Network Model
پذیرفته شده برای پوستر
کد مقاله : 1185-IMEC15 (R2)
نویسندگان
1دانشگاه تهران
2عضو هیئت علمی دانشکده مهندسی معدن دانشگاه تهران
چکیده
Integrated reservoir–surface network simulation links reservoir behavior with well performance and surface operating constraints. This study examines production performance and well shut-in behavior using an ECLIPSE reservoir model coupled to GAP production and injection networks through RESOLVE. The reservoir model consists of a 9 × 1 × 7 grid (63 cells), two oil producers, one water injector, and one gas injector. GAP represents the production network and the water and gas injection networks. Separator pressure is maintained at 5.516 MPa (gauge). The producing-well limits are set to a gas–oil ratio of 890.5 m³/m³, defined as standard gas volume per stock-tank oil volume, and a water cut of 70%. Three forecasts cover the same scheduled one-year period using nominal daily, weekly, and monthly coupling intervals. Network optimization occurs at every coupling timestep, so the comparison reflects changes in both coupling and optimization frequency. Cumulative oil production at stock-tank conditions is approximately 202,571, 205,284, and 206,149 m³ for the daily, weekly, and monthly cases, respectively. Relative to the weekly case, the daily result is 1.32% lower and the monthly result is 0.42% higher. In all cases, PROD1 stops producing before PROD2. Gas–oil ratios at the last positive oil-rate records exceed the prescribed limit, while water cuts remain below 70%. These observations support an interpretation of shutdown associated with the gas–oil ratio limit. Recorded cessation times do not vary monotonically with the coupling interval. The results indicate that coupling schedules influence predicted production and recorded shutdown times. However, well-convergence messages, a fluid-property table warning, and an unresolved discrepancy between reported simulator times require further investigation. The comparison therefore does not establish numerical convergence or predictive accuracy.
کلیدواژه ها
Integrated asset modeling؛ Reservoir–surface network coupling؛ Production forecasting؛ Coupling interval؛ Well shut-in
موضوعات